Hydroelectric power plant located in the city of Chucas, located 50 kilometers west of the capital of Costa Rica. The works consisted of the construction of a dam of over 50 meters in height and 230 in length, with a volume of 190,000 cubic meters of water. The works for the hydroelectric power plant were completed with the construction of a landfill, as well as the access roads to the new facilities and a new bridge over the reservoir.
Description
Sten Products
STEN products used in the project
Stenform, 1C climbing ,24T Shoring
REQUIREMENTS
Study and supply in order to create dam formwork, consisting of large-sized inclined walls.
The Stenform wall system, combined with 1C climbing, enabled them to adapt to the geometry, as well as design and build special pieces for curved areas.